Macau
Refuse Incineration Plant, Taipa
©Ó³y ¥JµI¤ÆÄl¤§¿ûµ²ºc¨î§@¤Î¦w¸Ë¤uµ{¡F
¤uµ{¶q¡G«Î¬[¿ûµ²ºc940¾·¡B¤£ù׿û±×¥x320m2
¡B90m°ª·Ï§w³»³¡²V¾®¤gµ²ºc¤uµ{¡C
We
fabricated in-situ and installed 940 tons of structural
steel works, including sandblasting and coating. Installed
320m2 of stainless steel slope platform.
Constructed the concrete structure at top portion of
90m Stack Chimney.
§¹¤uCompletion¡G02/1992
|
|

|
·s´ä¿D½XÀY-ª½ª@¾÷©W
New
HK Macau Ferry Terminal Heliport
©Ó³y·s´ä¿D½XÀY5,000m2¤§ª½¤É¾÷©W¥x¡A¦@¨î§@¦w¸Ë1,080¾·¿ûµ²ºc¡C¥t©Ó¥]±q·s´ä¿D½XÀY¦Ü¦^¤O350¦Ìªø¤§¿ûµ²ºc¦æ¤H¤Ñ¾ô¡C
Constructed
5,000m2
Heliport at the New HK Macau Ferry Terminal.
Works included fabrication and installation of 1,080
tons steel structure. Moreover, we built the 350 m elevated
steel pedestrian corridor from New HK Macau Ferry Terminal
to Jai-Alai Complex.
§¹¤uCompletion¡G12/1993
|
|
|
¿Dªù¤j¾Ç¤¤¸²±Ð¾Ç¤j¼Ó¤Î¦h¼h°±¨®³õ
University
of Macau-Luso Chinese Building & Multi-level Carparks
Á`¤À¥]©Ó«Ø5¼h°ª±Ð¾Ç¤j¼Ó¡A3¼h°±¨®³õ
As
main Subcontractor constructed one 5-storey block and
3 level carpark building.
§¹¤uCompletion¡G03/1996
|
|
|
ªF¤è°òª÷·|
Oriental
Foundation Building
««Ø¤Ñ±¨¾¤ô¤uµ{
Rehabilitation
of roofing work to Casa Garden Building.
§¹¤uCompletion¡G04/1997
|
|
|
¿Dªù
¥J®ð¶H¥x
Macau
Meteorology Station
¬°¿Dªù®ð¶H¥x¤g«Ø¤Î¸Ëפuµ{¤§Á`¤À¥]
As
principal sub-contractor for the construction of 2000m2
floor areas and 60m high Electronic Surveillance Tower.
¬I¤u´ÁPeriod¡G09/95~01/97
in two Phases
|
|
|
¸ôÀô¹q¼tCNS¥[¼h½·s
Coloane
Power Station CNS Additional Floor
¥[«Ø²V¾®¤gµ²ºc¼h¡B¿ûµ²ºc«Î»\©M«Ç¤ºªoº£Â½·s¤uµ{¡C
Constructed
an additional structural concrete floor, metallic roof
and interior repainting works.
§¹¤uCompletion¡G01/199
|
|
|
¿Dªù°ê»Ú¾÷³õ - ¸¾÷ºû×®w
Masc
Ogden Aircraft Maintenance Hangar
©Ó³y74mªø 86m¸ó«×¡B28m°ªªiµ747-400¸¾÷ºû×®w¡A¥Ñ¿D¤j§Q¨ÈStrarch
International±M§Q³]p¡A¥ÎÀ³¤O±i©Ô´£¤É¿û¬[µ²ºc¦¨«ý§Î¡C552¾·¿ûµ²ºc¡B85¾·¬±±ø¡B12,140m2«O·Å»\ªO.
We
constructed the Masc Ogden B747-400 Air Craft Maintenance
Hangar, as designed by the patented Strarch International
Ltd.¡¦s Stress-arch System from Australia. The unique
feature of the system is the use of hydraulic jacks
to erect the structure via pre-stressing tendons passing
through the bottom chords of the trusses.552 tons of
steel structures, 85 tons of steel purlins and 12,140
m2 of roof and wall insulated claddings.
¬I¤u´Á
Period¡G03/1997~12/1997
|
|
|
®ü¨Æ³Õª«À]
Macau
Maritime Museum
««Ø¤Ñ±¨¾¤ô¤ÎùÙ¨¥é¥Û¿j¡A§ó§ï¸Ë×¶¡®æ¤uµ{¡C
Rehabilitation
of Waterproofing to roof and wall tiles, modification
of interior functions and decorative works.
§¹¤u
Completion¡G09/1997
|
|
|
¤d¸¹q¾¹¼t©Ð
Chin
Ip Industrial Factory
¬°¤¤¤s¤d¸¹q¾¹¼t¦b¿Dªù¸ôÀôÁp¥Í¤u·~§ø©Ó«Ø¼t©Ð¡A¼t©Ð±¿n2800m2¡C
We
completed the CHIN IP Industrial Factory in Coloane
Concordia Industrial Zone. Gloss factory areas: 2800
m2.
§¹¤u
Completion¡G08/1998
|
|
|
¼s¦{¸¾÷®w
- B757¸¾÷ºû×®w
Guangzhou
GAMECO Air Craft Maintenance Hangar
¦w¸Ë230¾·¿û¬[¡BçE»\6150m2«O·Å±mªO¡B¨î§@»Õ¼Ó¹w¨î²V¾®¤g¤Î¨î§@¦w¸Ë40¾·¤j©Ôªù¡C
¸¾÷®w±¿n
-- ªø¡G75m¡G50m
°ª¡G19m
Erected
230 tons of steel structures, 6150m2
of roof and wall claddings, pre-cast concrete mezzanine
floor, installed 40 tons of structural sliding doors,
and stressed erection of Hangar.
Hangar
Dimension: Length-75m; Width-50m; Height-19m
§¹¤uCompletion¡G07/1999
|
|

|
ÃÀ¶é¥j¾ðÀJ¶ì¹³
Porto
Exterior Park Sculpture Chinese Ancient Tree
©Ó³y¦w¸Ë¤£¦P³]p¤§¿ûµ²ºcÃÀ³NÀJ¶ì¥j¾ð8´Ê¡A®y¸¨©ó¸²¨Ê¹ï±ÃÀ¶é¤£¦P¤§´ºÂI¡C
We
fabricated and installed 8 sets of teel Sculptures (Ancient
Tree) at Porto Exterior Park.
§¹¤uCompletion¡G10/1999
|
|
|
¿D·þ©²¤Î¿D·þ©xªó½·sªoº£¤uµ{
Governor
Palace & Santa Sancha Residence Painting Works
¦b1999¦~¿Dªù¦^Âk¤j¨å«e½·s¿D·þ©²¤Î¿D·þ©xªóªoº£¤uµ{¡C
Repainted
the Governor¡¦s Palace and the Residence before the Macau
Handover Ceremony on 20th Dec.1999.
§¹¤uCompletion¡G11/1999
|
|
|
ªF¤è¤åµØ°s©±¥~Àð×µ¤uµ{
Mandarin
Oriental Hotel External Wall Refurbishment
©Ó³yªF¤è¤åµØ°s©±¥~Àð×µ¤uµ{¡A±Nì¨Ó20,700m2¥~ùÙ¬Á¼þ°¨ÁɧJ×µ¡A·s§å¶î¤WAMERON
COATING ¨¾¤ô¶î®Æ¨t¦C¡C¦b¤»Ó¤ë¤º¤À¬q¬I¤u¡A¤£¼vÂQ¶W¹L35%ªº¦í©Ð¤ÎÄY®æ±±¨î¾¸µ±¡ªp¤U§¹¦¨¡C
We
refurbished the external wall mosaic tiles of The Mandarin
Oriental Hotel (20,700 m2)
with Ameron Water Proofing Coating System. Affected
maximum 35 % of rooms during construction by careful
phasing of works within 6 months.
§¹¤uCompletion¡G11/1999
|
|
|
½¬ªá¤j¾ô--¿Dªù¬q
Macau-China
Lotus Bridge Painting Works
©Ó³y¿Dªù¬q¥]¬A¸ó®ü³¡¥÷¤§¥DÅéªoº£¤uµ{¡A¦b35¤Ñ¤º¶¶§Q§¹¦¨52,000m2¤§ªoº£¤u§@¡C
We
challenged the painting works for Lotus Bridge (Macau
Section- including the main spans over the water). We
successfully completed the coating of 52,000m2
within 35 days.
§¹¤u
Completion¡G12/1999
|
|
|
¿Dªù¦^Âk¤j¨å¬õ¦a´àçE³]¤uµ{
(Macau
Handover Ceremony External Carpet Pavement)
¬°¿Dªù¦^Âk¤j¨å¡A§Ú¥q¦b23¤é¤ºçE³]2¸U3¤d¦h¥¤è¦Ì¤§¯S¨îÃC¦â¦a´à¡A¬°¾ú¥v©Ê¤@¨è²K¥[«º±m¡C
Supplied
and laid unique color carpet manufactured purposely
for the Grand Handover Ceremony of Administration on
20th Dec. 1999. Carpeted area of 23,000m2.
§¹¤uCompletion¡G12/1999
|
|
|
¸ôÀô¹q¼tºûפj¼Ó×ߤuµ{
Coloane
Power Station General Repairs of Maintenance Building
׸ɺû׺¯¤ô¡B½·s«Ç¤º¤Ñªá¡BùÙ¨¤Î¥~ùÙªoº£¡B§ó´«½¦¦aªO¡B§ó´«¤ô³ï¡C
We
renovated interior and exterior walls and ceilings,
replaced rubber floor tiles, waterproofing treatments
to walls and windows, and replaced water pipe system.
§¹¤uCompletion¡G03/2000
|
|
|
¿Dªù¹q¼tCMC
D25/D28¾÷פj¼Ó
Macau
Power Station CMC D25/D28 Engine Building
§ó´«¤Ñ±§|ªO¡B±Æ¤ô·¾¡B½·sµo¹q¼tªoº£¡B§ó´«·Àµ¾¹¡B±Æ®ðºÞ¤§¹j¼ö¼h¡B¤Î¹jµªO¡C
Replacement
of roof cladding sheets and gutters. Repainting the
Engine Building and replaced the insulations and claddings
for silencers, exhaust ducts and sound insulation panels.
§¹¤uCompletion¡G08/2000
|
|
|
ªQ¤sÀG¹D¤f±×©YÅ@¤g¤uµ{
Slope
Protection of Guia Hill Tunnel
92¦~«Ø³yªQ¤s«n¥_ÀG¹D¶i¥X¤fªº¸Ë¹¢Å@¤gÀð¡A2000¦~¤»¤ë×´_ÀG¹D³»³¡·Æ©Y¡A¥[³]«B¤ô©ú´ë¡AçE³]¨¾«B¤ô¨R»kMiramat
TM8´à614m2¤Î¼½®â¯óºØ¡C
Constructed
retaining structures and finishes for the entrances
of Guia Hill Tunnel in 1992. Restored landslides on
top of entrances with stepped gutters, Miramat TM8 slope
protection and hydro-seeding in 2000 July.
§¹¤uCompletion¡G09/2000
|
|
|
¿Dªù¹q¤O¤j¼Ó¥~Àð×µ¤uµ{
Macau
CEM Building External Wall Refurbishment
¬°¿Dªù¹q¤O¤½¥q¤j¼Ó¥~Àð×µ¤uµ{¡A²M°£¯È¥Ö¥Û鸨¤Î·¤Æ¯Ê³´¡B¥~ÀðµõÁ_¤Îµ¡½¦¦Ñ¤Æ¡A±¿n¦@
13,135m2¡A·s§å¶î¤WSKK¶î®Æ¨t¦C¡A°£¤F¥i¸Ñ¨M¥~À𱾹аÝÃD¡AÁÙ¥i«O«ù¥~ÀðÁL·s±»ª¡A¤u´Á¬°110¤Ñ¡C
We
rehabilitated 13,135 m2
of external wall mosaic tiles of CEM building with SKK
Orange Peel Coating System which controls adherence
of dust and has high retention of colors for the appearance
of building. Completed within 110 days.
§¹¤uCompletion¡G12/2000
|
|
|
¸ôÀô¹q¼tG3/G4±±¨î«Ç¤ÎHV«Ç×Å@
Coloane
Power Station G3/G4 Control Rm. & HV Rm.
§ó´«¹q¸£¦aªO¡B׸ɵ¡¤fº|¤ô¡Bºû×¹q¾¹³]³Æ¤Î§N®ð¨t²Î¡B½·sùÙ¨ªoº£¡Bºû×°²¤Ñªá¨t²Î¡C
We
renovated Control Rm. & HV Rm. with replacement
of all access floor panels, reinstated and repaired
window leakings, air conditioning insulation system
and false ceilings.
§¹¤uCompletion¡G12/2000
|
|
|
¤E¿DGTGµo¹q¾÷¼t©Ð
Coloane
Power Station GTG Building
¦w¸Ë320¾·¿ûµ²ºc¤Î2900m2¹j¼ö»\ªO
Erect
320 tons of Steel Structure and fix of 2,900m2
insulated claddings.
¬I¤u´ÁPeriod¡G03/2001~05/2001
|