Job Photo Reference

¿Dªù¥JµI¤ÆÄl

Macau Refuse Incineration Plant, Taipa

©Ó³y¥JµI¤ÆÄl¤§¿ûµ²ºc¨î§@¤Î¦w¸Ë¤uµ{¡F
¤uµ{¶q¡G«Î¬[¿ûµ²ºc940¾·¡B¤£ù׿û±×¥x320m2 ¡B90m°ª·Ï§w³»³¡²V¾®¤gµ²ºc¤uµ{¡C

We fabricated in-situ and installed 940 tons of structural steel works, including sandblasting and coating. Installed 320m2 of stainless steel slope platform. Constructed the concrete structure at top portion of 90m Stack Chimney.

§¹¤uCompletion¡G02/1992

·s´ä¿D½XÀY-ª½ª@¾÷©W

New HK Macau Ferry Terminal Heliport

©Ó³y·s´ä¿D½XÀY5,000m2¤§ª½¤É¾÷©W¥x¡A¦@¨î§@¦w¸Ë1,080¾·¿ûµ²ºc¡C¥t©Ó¥]±q·s´ä¿D½XÀY¦Ü¦^¤O350¦Ìªø¤§¿ûµ²ºc¦æ¤H¤Ñ¾ô¡C

Constructed 5,000m2 Heliport at the New HK Macau Ferry Terminal. Works included fabrication and installation of 1,080 tons steel structure. Moreover, we built the 350 m elevated steel pedestrian corridor from New HK Macau Ferry Terminal to Jai-Alai Complex.

§¹¤uCompletion¡G12/1993

¿Dªù¤j¾Ç¤¤¸²±Ð¾Ç¤j¼Ó¤Î¦h¼h°±¨®³õ

University of Macau-Luso Chinese Building & Multi-level Carparks

Á`¤À¥]©Ó«Ø5¼h°ª±Ð¾Ç¤j¼Ó¡A3¼h°±¨®³õ

As main Subcontractor constructed one 5-storey block and 3 level carpark building.

§¹¤uCompletion¡G03/1996

ªF¤è°òª÷·|

Oriental Foundation Building

­««Ø¤Ñ­±¨¾¤ô¤uµ{

Rehabilitation of roofing work to Casa Garden Building.

§¹¤uCompletion¡G04/1997

¿Dªù ¥J®ð¶H¥x

Macau Meteorology Station

¬°¿Dªù®ð¶H¥x¤g«Ø¤Î¸Ë­×¤uµ{¤§Á`¤À¥]

As principal sub-contractor for the construction of 2000m2 floor areas and 60m high Electronic Surveillance Tower.

¬I¤u´ÁPeriod¡G09/95~01/97 in two Phases

¸ôÀô¹q¼tCNS¥[¼h½·s

Coloane Power Station CNS Additional Floor

¥[«Ø²V¾®¤gµ²ºc¼h¡B¿ûµ²ºc«Î»\©M«Ç¤ºªoº£Â½·s¤uµ{¡C

Constructed an additional structural concrete floor, metallic roof and interior repainting works.

§¹¤uCompletion¡G01/199

¿Dªù°ê»Ú¾÷³õ - ­¸¾÷ºû­×®w

Masc Ogden Aircraft Maintenance Hangar

©Ó³y74mªø 86m¸ó«×¡B28m°ªªi­µ747-400­¸¾÷ºû­×®w¡A¥Ñ¿D¤j§Q¨ÈStrarch International±M§Q³]­p¡A¥ÎÀ³¤O±i©Ô´£¤É¿û¬[µ²ºc¦¨«ý§Î¡C552¾·¿ûµ²ºc¡B85¾·¬±±ø¡B12,140m2«O·Å»\ªO.

We constructed the Masc Ogden B747-400 Air Craft Maintenance Hangar, as designed by the patented Strarch International Ltd.¡¦s Stress-arch System from Australia. The unique feature of the system is the use of hydraulic jacks to erect the structure via pre-stressing tendons passing through the bottom chords of the trusses.552 tons of steel structures, 85 tons of steel purlins and 12,140 m2 of roof and wall insulated claddings.

¬I¤u´Á Period¡G03/1997~12/1997

®ü¨Æ³Õª«À]

Macau Maritime Museum

­««Ø¤Ñ­±¨¾¤ô¤ÎùÙ¨­¥é¥Û¿j¡A§ó§ï¸Ë­×¶¡®æ¤uµ{¡C

Rehabilitation of Waterproofing to roof and wall tiles, modification of interior functions and decorative works.

§¹¤u Completion¡G09/1997

¤d¸­¹q¾¹¼t©Ð

Chin Ip Industrial Factory

¬°¤¤¤s¤d¸­¹q¾¹¼t¦b¿Dªù¸ôÀôÁp¥Í¤u·~§ø©Ó«Ø¼t©Ð¡A¼t©Ð­±¿n2800m2¡C

We completed the CHIN IP Industrial Factory in Coloane Concordia Industrial Zone. Gloss factory areas: 2800 m2.

§¹¤u Completion¡G08/1998

¼s¦{­¸¾÷®w - B757­¸¾÷ºû­×®w

Guangzhou GAMECO Air Craft Maintenance Hangar

¦w¸Ë230¾·¿û¬[¡BçE»\6150m2«O·Å±mªO¡B¨î§@»Õ¼Ó¹w¨î²V¾®¤g¤Î¨î§@¦w¸Ë40¾·¤j©Ôªù¡C

­¸¾÷®w­±¿n -- ªø¡G75m¡G50m °ª¡G19m

Erected 230 tons of steel structures, 6150m2 of roof and wall claddings, pre-cast concrete mezzanine floor, installed 40 tons of structural sliding doors, and stressed erection of Hangar.

Hangar Dimension: Length-75m; Width-50m; Height-19m

§¹¤uCompletion¡G07/1999

ÃÀ¶é¥j¾ðÀJ¶ì¹³

Porto Exterior Park Sculpture Chinese Ancient Tree

©Ó³y¦w¸Ë¤£¦P³]­p¤§¿ûµ²ºcÃÀ³NÀJ¶ì¥j¾ð8´Ê¡A®y¸¨©ó¸²¨Ê¹ï­±ÃÀ¶é¤£¦P¤§´ºÂI¡C

We fabricated and installed 8 sets of teel Sculptures (Ancient Tree) at Porto Exterior Park.

§¹¤uCompletion¡G10/1999


¿D·þ©²¤Î¿D·þ©xªó½·sªoº£¤uµ{

Governor Palace & Santa Sancha Residence Painting Works

¦b1999¦~¿Dªù¦^Âk¤j¨å«e½·s¿D·þ©²¤Î¿D·þ©xªóªoº£¤uµ{¡C

Repainted the Governor¡¦s Palace and the Residence before the Macau Handover Ceremony on 20th Dec.1999.

§¹¤uCompletion¡G11/1999

 

ªF¤è¤åµØ°s©±¥~Àð­×µ¤uµ{

Mandarin Oriental Hotel External Wall Refurbishment

©Ó³yªF¤è¤åµØ°s©±¥~Àð­×µ¤uµ{¡A±N­ì¨Ó20,700m2¥~ùÙ¬Á¼þ°¨ÁɧJ­×µ¡A·s§å¶î¤WAMERON COATING ¨¾¤ô¶î®Æ¨t¦C¡C¦b¤»­Ó¤ë¤º¤À¬q¬I¤u¡A¤£¼vÂQ¶W¹L35%ªº¦í©Ð¤ÎÄY®æ±±¨î¾¸­µ±¡ªp¤U§¹¦¨¡C

We refurbished the external wall mosaic tiles of The Mandarin Oriental Hotel (20,700 m2) with Ameron Water Proofing Coating System. Affected maximum 35 % of rooms during construction by careful phasing of works within 6 months.

§¹¤uCompletion¡G11/1999

½¬ªá¤j¾ô--¿Dªù¬q

Macau-China Lotus Bridge Painting Works

©Ó³y¿Dªù¬q¥]¬A¸ó®ü³¡¥÷¤§¥DÅéªoº£¤uµ{¡A¦b35¤Ñ¤º¶¶§Q§¹¦¨52,000m2¤§ªoº£¤u§@¡C

We challenged the painting works for Lotus Bridge (Macau Section- including the main spans over the water). We successfully completed the coating of 52,000m2 within 35 days.

§¹¤u Completion¡G12/1999

 

¿Dªù¦^Âk¤j¨å¬õ¦a´àçE³]¤uµ{

(Macau Handover Ceremony External Carpet Pavement)

¬°¿Dªù¦^Âk¤j¨å¡A§Ú¥q¦b23¤é¤ºçE³]2¸U3¤d¦h¥­¤è¦Ì¤§¯S¨îÃC¦â¦a´à¡A¬°¾ú¥v©Ê¤@¨è²K¥[«º±m¡C

Supplied and laid unique color carpet manufactured purposely for the Grand Handover Ceremony of Administration on 20th Dec. 1999. Carpeted area of 23,000m2.

§¹¤uCompletion¡G12/1999

¸ôÀô¹q¼tºû­×¤j¼Ó­×ߤuµ{

Coloane Power Station General Repairs of Maintenance Building

­×¸Éºû­×º¯¤ô¡B½·s«Ç¤º¤Ñªá¡BùÙ¨­¤Î¥~ùÙªoº£¡B§ó´«½¦¦aªO¡B§ó´«¤ô³ï¡C

We renovated interior and exterior walls and ceilings, replaced rubber floor tiles, waterproofing treatments to walls and windows, and replaced water pipe system.

§¹¤uCompletion¡G03/2000

¿Dªù¹q¼tCMC D25/D28¾÷­×¤j¼Ó

Macau Power Station CMC D25/D28 Engine Building

§ó´«¤Ñ­±§|ªO¡B±Æ¤ô·¾¡B½·sµo¹q¼tªoº£¡B§ó´«·À­µ¾¹¡B±Æ®ðºÞ¤§¹j¼ö¼h¡B¤Î¹j­µªO¡C

Replacement of roof cladding sheets and gutters. Repainting the Engine Building and replaced the insulations and claddings for silencers, exhaust ducts and sound insulation panels.

§¹¤uCompletion¡G08/2000

ªQ¤sÀG¹D¤f±×©YÅ@¤g¤uµ{

Slope Protection of Guia Hill Tunnel

92¦~«Ø³yªQ¤s«n¥_ÀG¹D¶i¥X¤fªº¸Ë¹¢Å@¤gÀð¡A2000¦~¤»¤ë­×´_ÀG¹D³»³¡·Æ©Y¡A¥[³]«B¤ô©ú´ë¡AçE³]¨¾«B¤ô¨R»kMiramat TM8´à614m2¤Î¼½®â¯óºØ¡C

Constructed retaining structures and finishes for the entrances of Guia Hill Tunnel in 1992. Restored landslides on top of entrances with stepped gutters, Miramat TM8 slope protection and hydro-seeding in 2000 July.

§¹¤uCompletion¡G09/2000

¿Dªù¹q¤O¤j¼Ó¥~Àð­×µ¤uµ{

Macau CEM Building External Wall Refurbishment

¬°¿Dªù¹q¤O¤½¥q¤j¼Ó¥~Àð­×µ¤uµ{¡A²M°£¯È¥Ö¥Û­é¸¨¤Î­·¤Æ¯Ê³´¡B¥~ÀðµõÁ_¤Îµ¡½¦¦Ñ¤Æ¡A­±¿n¦@ 13,135m2¡A·s§å¶î¤WSKK¶î®Æ¨t¦C¡A°£¤F¥i¸Ñ¨M¥~À𱾹аÝÃD¡AÁÙ¥i«O«ù¥~ÀðÁL·s­±»ª¡A¤u´Á¬°110¤Ñ¡C

We rehabilitated 13,135 m2 of external wall mosaic tiles of CEM building with SKK Orange Peel Coating System which controls adherence of dust and has high retention of colors for the appearance of building. Completed within 110 days.

§¹¤uCompletion¡G12/2000

¸ôÀô¹q¼tG3/G4±±¨î«Ç¤ÎHV«Ç­×Å@

Coloane Power Station G3/G4 Control Rm. & HV Rm.

§ó´«¹q¸£¦aªO¡B­×¸Éµ¡¤fº|¤ô¡Bºû­×¹q¾¹³]³Æ¤Î§N®ð¨t²Î¡B½·sùÙ¨­ªoº£¡Bºû­×°²¤Ñªá¨t²Î¡C

We renovated Control Rm. & HV Rm. with replacement of all access floor panels, reinstated and repaired window leakings, air conditioning insulation system and false ceilings.

§¹¤uCompletion¡G12/2000

¤E¿DGTGµo¹q¾÷¼t©Ð

Coloane Power Station GTG Building

¦w¸Ë320¾·¿ûµ²ºc¤Î2900m2¹j¼ö»\ªO

Erect 320 tons of Steel Structure and fix of 2,900m2 insulated claddings.

¬I¤u´ÁPeriod¡G03/2001~05/2001